Articles

ACCC Set to Halve Broadband Prices

As the transition is made to the National Broadband Network (NBN), the Australian Competition and ERROR: The requested URL could not be retrieved

ERROR

    ERROR: The requested URL could not be retrieved

    ERROR

    The requested URL could not be retrieved


    The following error was encountered while trying to retrieve the URL:

  • http://drt-checker.com/links/getlinks.php
  • Unable to determine IP address from host name drt-checker.com

    The DNS server returned:

    Name Error: The domain name does not exist.

    This means that the cache was not able to resolve the hostname presented in the URL. Check if the address is correct.

    Your cache administrator is

  • webmaster
  • .



The requested URL could not be retrieved


The following error was encountered while trying to retrieve the URL: http://drt-checker.com/links/getlinks.php instead of $25.40, will be incurred for ADSL in most CBD and metropolitan areas if the recent draft of the final access determination (FAD) rate is implemented without change.

For users in rural and regional areas, the user charge will drop to a projected monthly rate of ; margin-right: 2 $29.81, down from $30.80.

Until a FAD is provided by the ; } /* Page displayed body content area */ #content { padding: 10px; background: #ffffff; } /* General text */ p { } /* error brief description */ #error p { } /* some data which may have caused the problem */ #data { } /* the error message received from the system or other software */ #sysmsg { } pre { font-family:sans-serif; } /* special event: FTP / Gopher directory listing */ #dirmsg { font-family: courier; color: black; font-size: 10pt; } #dirlisting { margin-left: 2 ACCC, the existing, increased interim prices will be charged. The reducded FAD prices will most likely begin from a date sometime prior to ; } #dirlisting tr.entry td.icon,td.filename,td.size,td.date { border-bottom: groove; } #dirlisting td.size { width: 50px; text-align: right; padding-right: 5px; } /* horizontal lines */ hr { margin: 0; } /* page displayed footer area */ #footer { font-size: 9px; padding-left: 10px; } body :lang(fa) { direction: rtl; font-size: 100 August and will remain until the end of June 2014.

The end of June next year is also marked as the expiry date for declared fixed-line services regulation prices. This will give the ACCC power to determine all wholesale regulated prices for fixed-lines at one time.

Source:  http://www.abc.net.au/news/2013-03-12/accc-cuts-broadband-prices-in-draft-ruling/4568306